WA

CITY LINK RAIL

Perth City Link reconnected Perth’s CBD with Northbridge by sinking a 600-meter section of the rail line.

Location

WA

Tons

10000T

Length

2 YEARS

OVERVIEW

We supplied in excess of 10,000t of reinforcement to the Perth City Link Rail Alliance (a joint venture between PTA, John Holland and GHD) between November 2011 and December 2013. The project included the supply of 1835t of prefabricated D-Wall Cages and 1287t of Cage Piles along with 50,000 Dextra Rolltec Couplers used to connect the roof and floor slabs, all of this fabrication work being carried at an offsite facility in Henderson and delivered to site ready for installation.